DVBE OSDS 59858 CA Lic. #925955 · Class A / C-10 IBEW 47 & 569 619.713.6880

Selected work

Utility infrastructure built in Southern California.

Selected substations, transmission, and energy-storage work across Southern California.

  1. Completed 2024Melrose SubstationVista. Site development, underground, structural concrete, and SWPPP.
  2. Ongoing supportIID Avenue 42Indio. $12 million upgrade adding a third transformer bank.
  3. Completed 2022TL6975Escondido to San Marcos. Mass grading, drilled piers, and conduit intercepts.
  4. Completed 2020SDG&E HATSSan Diego County. Helicopter pads, TSAPs, and hand-dug piers.
Concrete and civil work at Melrose Substation in Vista

01 · Vista, CA · 2024

Melrose Substation

Patriot completed this substation site development in Vista: grading, underground, structural concrete, foundations, biofiltration, and SWPPP.

  • Substation civil
  • Structural concrete
  • SWPPP
  • CIP walls
IID Avenue 42 substation upgrade

02 · Indio · IID · 2026

IID Avenue 42 Substation

Ongoing support. Patriot General is supporting IID’s Avenue 42 Substation Upgrade with Henkels & McCoy West: a $12 million upgrade adding a third transformer bank.

  • $12M IID upgrade
  • Third transformer bank
  • Henkels & McCoy West
Learn more ↗
Civil construction on TL6975 from Escondido to San Marcos

03 · Escondido to San Marcos · 2022

TL6975

Patriot completed this transmission civil package in 2022: mass grading, native rock reused as fill, drilled-pier and micropile foundations, keystone wall, and conduit intercepts.

  • Mass grading
  • Drilled piers
  • Micropiles
  • Keystone wall
Transmission work in Southern California terrain

04 · San Diego County · 2020

SDG&E HATS

Patriot completed SDG&E Helicopter Access for Transmission Structures: landing-zone grading, long-lining, heli-pads, TSAPs, and hand-dug piers in rugged terrain.

  • Helicopter LZ
  • Long-lining
  • Heli-pads
  • TSAP

Energy storage & additional work

BESS and completed substations.

Energy-storage civil packages and a completed substation.

05

Rosamond Central BESS

Completed 2025. Kern County. Mobilization, conduit trenching and backfill, and grounding trench installation for a battery energy storage facility.

06

Fallbrook 02 BESS

Fallbrook, California. In construction as of the April 2025 record. Mobilization, below-grade conduit, Type 3316 boxes, spoil relocation, and SWPPP.

07

Santee BESS

Santee, California. In construction as of the April 2025 record. Foundations, conduit and grounding trenches, fencing, yard base and rock, SWPPP, staking, and spoil haul-off.

08

Point Loma Substation

Completed 2018. The project record lists the location as Poway, CA. Demolition, mass grading, storm drain, biofiltration, CMU walls, fencing, PCC curbs and sidewalks, traffic control, SWPPP, and soldier-beam wall installation.

Also named

Notable substations among 50+ sites.

Part of more than 50 substation sites. Scopes include grading, paving, materials import and export, utility relocation, and retaining walls.

  • Rancho Mission Viejo
  • Middleton
  • Clairemont
  • Talega