Completed 2018 · Record location: Poway, CA
Point Loma Substation
Substation civil package on the company record: demolition, mass grading, storm drain, biofiltration, CMU, and a soldier-beam wall.
The project record names this job Point Loma Substation, lists it completed in 2018, and lists the location as Poway, CA.
Published scopes are demolition of existing PCC foundations and asphalt, mass grading with over-excavation, recompact, and finish grade, storm drain, biofiltration, CMU wall footings and walls, fencing, PCC curbs, sidewalks, and structural concrete foundations, traffic control, SWPPP, and soldier-beam wall installation.
- Demolition
- Mass grading
- Storm drain
- Biofiltration
- CMU walls
- PCC curbs and sidewalks
- Structural concrete
- Soldier-beam wall
- Traffic control
- SWPPP