Vista, CA · Completed 2024
Melrose Substation
Substation site development in Vista, from grading and underground through structural concrete and SWPPP.
Patriot General completed Melrose Substation site development in Vista in 2024. The yard work covered grading, trenching and underground, structural concrete, foundations, a biofiltration system, and SWPPP.
The published capability list for this job also includes demolition, drilling, hand digging, wet and dry utilities, drainage and storm drains, dust control, concrete surface repair, CIP walls, trucking and hauling, water sourcing, value engineering, and non-conductive fencing.
- Substation site development
- Grading
- Trenching and underground
- Structural concrete
- Foundations
- Biofiltration
- SWPPP
- CIP walls
- Non-conductive fencing
- Wet and dry utilities