Poway, CA · Completed 2018
Poway Substation
Substation civil work in Poway: demolition, mass grading, storm drain, biofiltration, and CMU.
Patriot General’s record lists Poway Substation as completed in 2018 in Poway, CA.
Published scopes are demolition of existing PCC foundations and asphalt, mass grading with over-excavation, recompact, and finish grade, storm drain, biofiltration, CMU wall footings and walls, fencing, PCC curbs, sidewalks, and structural concrete foundations, traffic control, and SWPPP installation and maintenance.
- Foundation and asphalt demolition
- Mass grading
- Storm drain
- Biofiltration
- CMU walls
- Structural concrete
- Traffic control
- SWPPP